1. Unqualified precision stamping parts for identification.
2. Raw materials purchased do not meet the requirements of the procurement plan specifications, standards, outsourcing does not meet the contract or order of the various technical standards, parameters and appearance, specifications, are nonconforming product.
3. The purchase of raw materials and outsourcing of nonconforming products IQC is responsible for the quality control department of the company responsible for the inspection, at the same time issued a <Corrective and preventive measures> to the procurement, procurement should be fax or Email the report to the supplier, the bad information to the At the same time, the supplier submits the report to the relevant responsible department for MRB processing. IQC will process the nonconforming product according to the judgment in the report. IQC should follow up with the supplier about the correction of the nonconforming product.
4.IQC found nonconforming product should be affixed with unqualified label for identification and isolation, IQC should be in dealing with nonconforming product advice, in collaboration with other departments according to the treatment of unqualified IQC.
5. If the urgent need to use, the MRB decided to take over the mining of raw materials in use, the quality control department should be affixed to the material yellow "special mining label" for identification and tracking.
6. Rework or sorting process after the re-examination of qualified precision stampings, should be labeled qualified storage of goods, re-inspection of non-conforming items are returned.